Bernold, L E, Lorenc, S J and Davis, M L (2001) Technological Intervention to Eliminate Back Injury Risks for Nailing. Journal of Construction Engineering and Management, 127(03), 245–50.

Chang, L and Chen, P (2001) BOT Financial Model: Taiwan High Speed Rail Case. Journal of Construction Engineering and Management, 127(03), 214–22.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(214)
  • Abstract:
    Owing to the high cost of large construction projects in recent years, build-operate-transfer (BOT) contracts are getting popular in the global construction market, especially in infrastructure construction. With BOT, the government is able to put projects on track without concerning itself too much about raising funds. On the other hand, due to the fact that the concessionaire who is awarded the project is responsible for the operation of the end facility for a certain period of time, reliable quality of the facility and effective operation could be expected. This paper introduces the financial model used by the Bureau of Taiwan High Speed Rail for its BOT projects. The parameters and variables of the model are presented. Its basic assumptions, input data, cost requirement, self-financing ability analysis, financial statements, and indices are discussed. The scenario analysis is used to highlight the application of the model.

El-Rayes, K (2001) Object-Oriented Model for Repetitive Construction Scheduling. Journal of Construction Engineering and Management, 127(03), 199–205.

El-Razek, M E A and Basha, I M (2001) Constructability Improvement of Bridges Using Stepping Formwork. Journal of Construction Engineering and Management, 127(03), 206–13.

Hegazy, T and Wassef, N (2001) Cost Optimization in Projects with Repetitive Nonserial Activities. Journal of Construction Engineering and Management, 127(03), 183–91.

Hiyassat, M A S (2001) Applying Modified Minimum Moment Method to Multiple Resource Leveling. Journal of Construction Engineering and Management, 127(03), 192–8.

Kangari, R and Bakheet, M (2001) Construction Surety Bonding. Journal of Construction Engineering and Management, 127(03), 232–8.

Mitropoulos, P and Howell, G (2001) Model for Understanding, Preventing, and Resolving Project Disputes. Journal of Construction Engineering and Management, 127(03), 223–31.

Moua, B and Russell, J S (2001) Comparison of Two Maintainability Programs. Journal of Construction Engineering and Management, 127(03), 239–44.

Oberlender, G D and Trost, S M (2001) Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. Journal of Construction Engineering and Management, 127(03), 173–82.